STAKEHOLDER MANAGEMENT AND IMPLEMENTATION OF NGO’S PROJECTS IN NAIROBI COUNTY

Authors

  • Chepkemoi Joan Jomo Kenyatta University of Agriculture and Technology Author
  • Dr. Musembi K. Annastacia Jomo Kenyatta University of Agriculture and Technology Author

Keywords:

Stakeholder Management, Stakeholder Identification, Stakeholder Involvement, Implementation of NGO’s projects

Abstract

Non-governmental organizations have in the past been involved in relief, emergency or longer-term development work or a mixture of all three. It has been asserted that often NGOs fail to achieve the target objectives of their projects or even leave before task completion despite the role that they play. This study therefore sought to examine stakeholder management and implementation of NGO’s projects in Nairobi County. Specifically, this study sought to determine the stakeholder identification and implementation of NGO’s projects in Nairobi County, to examine the level of stakeholder involvement and implementation of NGO’s projects in Nairobi County. This study used a descriptive research design. According to the Kenya Business Directory, there are 201 NGOs working in Nairobi City County which was the study population. All the 201 NGO's operating within Nairobi County comprised the target population of this study. According to Kothari (2012), a representative is one that is at least 10% of the population of interest. Therefore, from each stratum NGOs were selected to make a sample of 100 NGOs project managers which represented 50% of the population. Primary data was used in this study. The study’s primary data was obtained using structured questionnaires. The researcher carried out a pilot study to ensure the data collection tool is reliable and valid. Quantitative data was generated from the structured questionnaire. Before the data can be analyzed, the researcher ensured the data was checked for completeness, followed by data editing, data coding, data entry, and data cleaning. Inferential and descriptive statistics were employed for analysis of quantitative data with the assistance of Statistical Package for Social Sciences (SPSS version 25). Data analysis was done using descriptive statistics and inferential statistics. Inferential data analysis was conducted by use of Pearson correlation coefficient, and multiple regression analysis. The study results were presented in tables and figures. The study concludes that stakeholder identification has a positive and significant influence on the implementation of NGO’s projects in Nairobi County. In addition, the study concludes that stakeholder involvement has a positive and significant influence on the implementation of NGO’s projects in Nairobi County. The study recommends that the management of NGOs should prioritize and invest in comprehensive stakeholder mapping and engagement strategies. In addition, the management of NGOs should develop and implement communication strategies that are tailored to the diverse stakeholder groups involved.

Author Biographies

  • Chepkemoi Joan, Jomo Kenyatta University of Agriculture and Technology

    Masters Student

  • Dr. Musembi K. Annastacia , Jomo Kenyatta University of Agriculture and Technology

    Lecturer

References

Aapaoja, A., & Haapasalo, H. (2014). A framework for stakeholder identification and classification in construction projects. Open Journal of Business and Management, , 2014.

Assistance, G. H. (2017). Development Initiatives, (2017). New York, USA: Lattner, C., &Swithern, S.

Atamba, B. (2016). Stakeholder management and project success: case of integrated financial management information system project in Kenya;Masters Dissertation . Nairobi: University of Nairobi.

Biskupek, A. (2016). The research of stakeholder power impact on project implementation. Trends Economics and Management , 10(27), 9-19.

Biskupek, A. (2016). The research of stakeholder power impact on project implementation. Trends Economics and Management, , 10(27), 9-19.

Bushuyev, S., Babayev, I., Babayev, J., & Kozyr, B. (2019). anagement of Humanitarian Projects in Conflict Zones Based on Complementary Neural Networks. n 5th IPMA SENET Project Management Conference (SENET 2019). Atlantis Press.

Franco, A., & Vaccaro, M. (2020). Sustainable Sizing of Geothermal Power Plants: Appropriate Potential Assessment Methods. Sustainability , 12(9), 3844.

Frick, J. E., Fremont, V. H., Åge, L.-J., & Osarenkhoe, A. (2020). Digitalizationefforts inliminal space – inter-organizationalchallenges. Journal of Business & Industria l Marketing , 35(1), 150-168, .

Grace, O. N., Odhiambo, A. I., & Amolo, O. P. (2020). Influence of Stakeholder Empowerment on Mobilization of Resources . Journal of Advances in Education and Philosophy , 17-28.

Gumbe, S. A. (2016). Influence of stakeholders involvement on implementation of projects in the aviation industry: a case of Kenya airways. Doctoral dissertation, University of Nairobi: Unversity of Nairobi.

Jung, T. H., Lee, J., Yap, M. H., & Ineson, E. M. (2015). The role of stakeholder collaboration in culture-led urban regeneration: A case study of the Gwangju project, Korea. Cities , 44, 29-39.

Kanyinga, K. (2016). Devolution and the new politics of development in Kenya. African Studies Review, , 59(3), 155-167.

Karanja, J. M. (2012). Impact of Project Management principles to Performance of Agribusiness projects. A case of Kinango district of Kwale County. Nairobi: Kenyatta University.

Mitigwe, B. (2015). The entrepreneurial firm internationalization process in the Southern African context: A comparative approach. International Journal of Entrepreneurial Behavior & Research, , 11(5).

Muchomba, F. G. (2015). Influence of devolved governance and performace of the health sector in Kenya. Strategic Journal of Business & Change Management, , 2(2).

Mustaro, P., & Rossi, R. (2013). Project management principles applied in academic research projects. n Proceedings of the Informing Science and Information Technology Education Conference , 3(4), 4-6.

Njogu, E. M. (2016). Influence of stakeholders involvement on project performance: A case of nema automobile emmission control project in nairobi county, kenya (Doctoral dissertation). University of Nairobi.

Nyaboga, E. K., Amuhaya, I. M., & Wanjala, M. Y. (2020). Moderating Role of Stakeholders Attributes on Implementation of Rural Electrification Projects in Kenya. Global Journal of Management And Business Research. , (23) 54-67.

Nyongesa, H. O., Musumba, G. W., & Chileshe, N. (2017). Partner selection and performance evaluation framework for a construction-related virtual enterprise: a multi-agent systems approach. Architectural Engineering and Design Management , 13(5), 344-364.

Omondi, N. N., & Kimutai, G. (2018). Stakeholder engagement conflicts and implementation of expansion and modernisation projects at Jomo Kenyatta International Airport in Nairobi, Kenya. International Academic Journal of Information Sciences and Project Management , 3(2), 12-36.

Onijigin, A. L. (2019). nteraction Between the Humanitarian stakeholders for decision making using system dynamics modelling. Aristotle University of Thessaloniki.

Onyango, L. B., Bwisa, H., & Orwa, G. (2017). Critical Factors Influencing the Implementation of Public Infrastructure Projects in Kenya: A Case of Thika Sub-County, Kiambu County Kenya. International Journal of Scientific and Research Publications , 7(5), 2250-3153.

Rajhans, K. (2018). Effective communication management: A key to stakeholder relationship management in project-based organizations. . IUP Journal of Soft Skills , 12(4), 47-66..

Rodrigues, A., & Bowers, J. (2016). System dynamics in project management: a comparative analysis with traditional methods. System Dynamics Review: The Journal of the System Dynamics Society , 12(2), 121-139.

Schwedes, O., Riedel, V., & Dziekan, K. (2017). Project planning vs. strategic planning: Promoting a different perspective for sustainable transport policy in European R&D projects. Case Studies on Transport Policy , 5(1), 31-37.

Taana, I. H. (2020). A Conceptual Framework on The Successful Adoption of Project Management Methodologies in Ghana. echnium Soc. Sci. J., , 10, 409.

Techera, E. J. (2018). Supporting blue economy agenda: fisheries, food security and climate change in the Indian Ocean. Journal of the Indian Ocean Region , 14(1), 7-27.

Wandabwa, K., & Yusuf, M. (2019). Effect of Stakeholder Management on Health Project Perfromance for National Hospital Insurance Fund Kenya. International Journal of Business Management and Finance, , 1(48), 821-838.

Wanjiku, S. M., Jonyo, F., & Alwanga, M. (2020). Domesticating the SDGs in Africa for Rural and Agricultural Development: The Case of Devolved Governance. In The Palgrave Handbook of Agricultural and Rural Development in Africa (pp. 17-40). Cham: Palgrave Macmillan.

Yu, T., Liang, X., Shen, G. Q., Shi, Q., & Wang, G. (2019). An optimization model for managing stakeholder conflicts in urban redevelopment projects in China. Journal of Cleaner Production, , 212, 537-547.

Zhang, J. J., Lichtenstein, Y., & Gander, J. (2015). Designing Scalable Business Models. Advances in Strategic Management;Business Models andModelling. In C. Baden-Fuller and V.Mangematineds: Emerald Press.

Downloads

Published

2024-09-20

How to Cite

STAKEHOLDER MANAGEMENT AND IMPLEMENTATION OF NGO’S PROJECTS IN NAIROBI COUNTY. (2024). International Journal of Management and Business Research, 6(1), 194-208. https://grandmarkpublishers.com/index.php/IJMBR/article/view/11