Abstract

The proposed study  investigated the relationship between project management practices and the successful execution of junior secondary school construction projects in Kenya. The significance of this research lies in its focus on the critical elements of project cost management and change management, and their impact on the success of construction projects. Identifying the effects of these project management practices is essential for policymakers, project managers, and other stakeholders involved in the implementation of construction projects in Kenya.Descriptive survey design was adopted for this study, targeting 32,594 primary schools in Kenya. This design is suitable because allowed the researcher to gather precise information about the phenomena under investigation, describing the characteristics, opinions, attitudes, preferences, and perceptions of individuals relevant to the study. The study used a large sample size calculated using the sample size formula for large populations, and data was collected through questionnaires administered to relevant stakeholders. Both descriptive and inferential data analyses was performed using SPSS version 29 and MS Excel to facilitate the analysis. The conceptual framework draws on the Resource Dependence Theory and (RDT) and Change management theory, providing a robust theoretical background for the study. Overall, the proposed study promises to contribute to the existing literature on project management practices in Kenya and shed light on the critical factors influencing the successful implementation of construction projects. The study concludes that that project cost management has a positive and significant influence on successful implementation of junior secondary classes’ construction projects in Kenya. Further, the study concludes that change management has a positive and significant influence on successful implementation of junior secondary classes’ construction projects in Kenya. Based on the findings, the study recommends that the management of construction projects in Kenya should adopt comprehensive and participatory budgeting during the planning phase. Engaging all relevant stakeholders ensures that cost estimates are realistic, inclusive, and account for potential risks.

 

Key Words: Project Management Practices, Project Cost Management, Change Management, Successful Implementation, Junior Secondary Classes Construction Projects

Author Biographies

  • Kiiru Dorian Ngugi, Jomo Kenyatta University of Agriculture and Technology

    Masters Student, Jomo Kenyatta University of Agriculture and Technology

  • Dr. Kyule Alexander , Jomo Kenyatta University of Agriculture and Technology

    Lecturer

References

Ajmal, M., Malik, M., & Saber, T. (2017). Challenges in managing projects within the public sector: A study of the Pakistan public sector. Management Decision, 55(1), 105-124.

Ahadzie, D. K., Kissi, E., & Adjei-Kumi, T. (2018). Critical analysis of constraints to successful implementation of construction projects in Ghana. Journal of Construction Engineering and Management, 144(5), 04018029.

Alias, Z., Mohamed, S., & Siraj, S. (2014). Critical success factors for construction projects in developing countries. International Journal of Construction Management, 14(1), 1-13.

Amoako-Yaa, A., & Addae-Mintah, K. (2018). Delays in public construction projects in Ghana: A comparative study of five categories of delay factors. Built Environment Project and Asset Management, 8(4), 380-394.

Anderson, V., & Gonzalez, R. (2011). Research Methods in Human-Computer Interaction. Wiley.

Agyemang-Dwomoh, B. (2017). Stakeholder engagement and communication strategy for construction projects. International Journal of Construction Project Management, 9(3), 27-34.

Anyia, N. O. (2016). Analysis of the causes of time overruns in construction projects in Nigeria. Journal of Construction in Developing Countries, 21(2), 17-36.

Asbjorn, R. J., et al. (2014). Project success and system success: A literature review. Paper presented at the 47th Hawaii International Conference on System Sciences.

Barnett, S. L. (2014). Stakeholder influence capacity and the variability of financial returns to corporate social responsibility. Academy of Management Review, 39(3), 507-525.

Besner, C., & Hobbs, B. (2019). The evolution of project management research in the last 25 years. International Journal of Project Management, 37(2), 241-255.

Burgan, B., & Burgan, S. C. (2018). Project success criteria: Setting and measurement. The Engineering Economist, 63(4), 259-282.

Desta, Y., Kothari, R., Sprecher, B., & Dornfeld, D. (2018). A review of methods supporting successful knowledge transfer in the manufacturing industry. Procedia CIRP, 67, 113-118.

Ethridge, D. E. (2018). Research methodology in applied economics (2nd ed.). Wiley.

Fernandes, C., Ward, S., & Arauj, M. (2018). Success factors for construction projects in Brazil: A Delphi study. International Journal of Construction Management, 18(4), 319-334.

Ferreira, F. A. F., Pinto, J. K., & Slevin, D. P. (2013). Developing the project-oriented organization: A research roadmap. Project Management Journal, 44(3), 3-16.

Fitsilis, P., & Chalatsis, N. (2014). Investigating the cost overrun problem in the Greek construction industry. Procedia Economics and Finance, 9, 290-297.

Fraz, M. A., Riaz, A., Iftikhar, M., Shahbaz, M., & Fayyaz, M. (2016). The impact of project management (PM) and knowledge management (KM) on project success: An empirical study. Procedia - Social and Behavioral Sciences, 226, 43-50.

Freeman, R. E. (1984). Strategic Management: A Stakeholder Approach. Cambridge University Press.

Kerzner, H. (2018). Project management: A systems approach to planning, scheduling, and controlling (12th ed.). Wiley.

Macharia, M. J. (2013). An assessment of the effectiveness of stakeholder management in project management: A case of Kenya’s Independent Electoral and Boundaries Commission. Unpublished Master's Thesis, University of Nairobi.

Mugenda, O. M., & Mugenda, A. G. (2018). Research methods: Quantitative and qualitative approaches. African Centre for Technology Studies Press.

Muller, R., & Jugdev, K. (2017). Critical success factors in projects: Pinto, Slevin, Cleland, and King. In The Oxford Handbook of Megaproject Management (pp. 43-63). Oxford University Press.

Odhiambo, S. O. (2019). Challenges facing the implementation of junior secondary school curriculum reforms in Kenya. Journal of Education, Society and Behavioural Science, 31(2), 1-14.

Parker, D. W., Ritson, N., & Sutherland, M. (2015). A statistical model of the construction project management process. International Journal of Project Management, 33(4), 858-867.

Project Management Institute (PMI). (2019). A Guide to the Project Management Body of Knowledge (PMBOK Guide) (6th ed.). Project Management Institute.

Sarkis, J. (2017). Modeling and management of risk. Springer.

Suk, S. I., Lee, S. Y., & Baek, S. (2017). Project management knowledge areas and their application in the management of time in Korean construction projects. Sustainability, 9(11), 2107.

Transparency International Kenya. (2020). A report on corruption risks in the implementation of the Competency-Based Curriculum (CBC) in Kenya. Retrieved from https://www.tikenya.org/publications/item/70-corruption-risks-in-the-implementation-of-the-competency-based-curriculum-cbc-in-kenya

Wana, O. J., Ogola, F., & Datche, K. (2019). Project management practices and successful implementation of junior secondary classes’ construction projects in Kenya in the Kenyan public sector. International Journal of Project Management, 37(8), 1042-1053.

Downloads

Published

2025-04-26

Issue

Section

Articles

How to Cite

PROJECT MANAGEMENT PRACTICES AND SUCCESSFUL IMPLEMENTATION OF JUNIOR SECONDARY CLASSES CONSTRUCTION PROJECTS IN KENYA. (2025). International Journal of Management and Business Research, 7(1), 216-229. https://grandmarkpublishers.com/index.php/IJMBR/article/view/99