IMES HUMAN RESOURCE CAPACITY FOR MONITORING & EVALUATION AND THE PERFORMANCE OF ROAD PROJECT IN KENYA
Keywords:
IMES Human Resource Capacity for Monitoring & Evaluation, Project Risks, Performance of Road ProjectAbstract
Road projects in Kenya have been characterized by substandard quality of work, cost overruns, poor stakeholder management and poor schedule management. This has been attributed to poor project management systems. This study therefore sought to establish the relationship between human resource capacity for monitoring & evaluation and the performance of road projects in Kenya through hypothesis testing and at the same time establish the moderating effect of Project Risks on the relationship between human resource capacity for monitoring & evaluation and performance of road projects in Kenya. The unit of analysis was the road construction projects implemented by National Government Road Agencies (KURA, KeRRA, and KeNHA) in Kenya, while the unit of observation was the project managers involved in the implementation of these road construction projects. The population for the research was 188 projects initiated and completed between the year 2015 and 2022 by the three agencies. The overall sample size for this study was determined using a formula by Fisher’s exact formula, which obtained 126 respondents. This study employed stratified random and purposive sampling method to select the study sample. Primary data was used and was collected using a semi-structured questionnaire. Samples of the questionnaire were pilot tested with 18 respondents to test for reliability and validity. The data was analyzed using the Statistical Package for Social Sciences (SPSS). The qualitative data collected was analyzed using thematic analysis and presented in text form. Quantitative data was analyzed using descriptive statistics and presented in tables and figures. The study concluded that human resource capacity positively and significantly influences performance of road projects in Kenya. In addition, the study concluded that project risks have significant moderating effect on the relationship between human resource capacity for monitoring & evaluation and performance of road projects in Kenya. Based on the findings, the study recommends that the management of road projects in Kenya should invest in continuous professional development and technical training for project personnel at all levels. By equipping engineers, project managers, supervisors, and support staff with up-to-date skills in modern construction techniques, project management tools, and regulatory compliance, the quality and efficiency of project execution are greatly enhanced.
Key Words: IMES Human Resource Capacity for Monitoring & Evaluation, Project Risks, Performance of Road Project
References
Ahmed, I. A, Kariuki, J., & Mathu, D. (2024). Health systems’ capacity in availability of human resource for health towards implementation of universal health coverage in Kenya. Retrieved from file:///C:/Users/user/Downloads/
Badir, Y. F., Büchel, B., &Tucci, C. L. (2012). A conceptual framework of the impact of NPD project team and leader empowerment on communication and performance: An alliance case context. International Journal of Project Management, 30(8), 914-926.
Bagenda, B., & Ndevu, Z. (2024). Project risks associated with public-private partnership projects in Uganda. Public Works Management & Policy 29(2), 184-232
Baker, C. (2017). Quantitative research designs: Experimental, quasi-experimental, and descriptive.
Chen, S. E., Hauser, E. W., Boyle, C. G., & Natarajan, M. (2015). U.S. Patent No. 9,036,861. Washington, DC: U.S. Patent and Trademark Office.
Cherrafi, A., Elfezazi, S., Govindan, K., Garza-Reyes, J. A., Benhida, K., &Mokhlis, A. (2017). A framework for the integration of Green and Lean Six Sigma for superior sustainability performance. International Journal of Production Research, 55(15), 4481-4515.
Diaz, T., Rasanathan, K., Meribole, E., Maina, I., Nsona, H., Aung, K. M., ...& O’Neill, K. P. (2018). Strategic Review of Child Health: Framework and strategy for integrated monitoring and evaluation of child health programmes for responsive programming, accountability, and impact. The BMJ, 362.
Ingabire, V. N. (2020). Human resource capacity building and retention: a challenge for the Rwandan Public Sector. Retrieved from https://core.ac.uk/download/pdf/
Kenya National Highways (2021) KeNHA Annual Report for the year ended 2021-2022 (Digital). Retrieved from https://kenha.co.ke/document/kenha-annual-report-for-the-yearended- 2021-2022-digital-version/
Kogetsidis, H. (2021). Systems methodologies for handling problem complexity. International Journal of Organizational Analysis.
Leavy, P. (2017). Research design: Quantitative, qualitative, mixed methods, arts-based, and community-based participatory research approaches. Guilford Publications.
Lee, D., & Hess, D. J. (2020). Regulations for on-road testing of connected and automated vehicles: Assessing the potential for global safety harmonization. Transportation Research Part A: Policy and Practice, 136, 85-98.
Moghadam, M. N, Amiresmaili, M., & Sadeghi, V. (2020). Qualitative study on human resources capacity for primary health care in Iran. Retrieved from https://d1wqtxts1xzle7.cloudfront.net/
Morf, A., Moodie, J., Gee, K., Giacometti, A., Kull, M., Piwowarczyk, J., ... & Strand, H. (2019). Towards sustainability of marine governance: Challenges and enablers for stakeholder integration in transboundary marine spatial planning in the Baltic Sea. Ocean & Coastal Management, 177, 200-212.
Moris, M. I, Alakhras, H. A., & Eid, N. G. (2021). Human resources capacity building in accessible tourism in Egypt. Journal of Association of Arab Universities for Tourism and Hospitality, 17(2), 82-89
Mwaguni, H. J, Mbugua, J., & Rambo, C. (2021). Logical model and research projects enhancement in public universities in the coast region of Kenya. Review Publishment Administration Management, 9(6), 1-10
Njama, A. W., &Kyalo, D. N. (2015). Determinants of effectiveness of a monitoring and evaluation system for projects: a case of AMREF Kenya WASH programme. University of Nairobi.
Osman, M. A., &Kimutai, G. (2019). Critical success factors in the implementation of road projects in Wajir County, Kenya. International Academic Journal of Information Sciences and Project Management, 3(3), 73-104.
Oyieyo, P. A., Rambo, C. M., & Ndiritu, A. (2023). Construction project risks and completion of public private partnership project in Kenya. Arabian journal of business and management review, 9(4), 1-6
Price, R. (2019). Mainstreaming Climate and Environmental Considerations into Existing Development Programmes.
Projahnmo, A. Q, Heblinski, A & Jahid, H. A. (2022). Influence of Integrated Monitoring and Evaluation Systems on Sustainability of Donor Funded Projects in Afghanistan. Journal of Entrepreneurship & Project Management, 6(3), 11-22.
Sharma, G. (2017). Pros and cons of different sampling techniques. International journal of applied research, 3(7), 749-752.
Shema, F., & Nkechi, E. I. (2022). Integrated Monitoring and Evaluation Systems and Performance of Construction Projects. Journal of Entrepreneurship & Project Management, 6(2), 119-144
Siamanda, N. G., & Wairimu, M. A. M. (2024). Integrated monitoring and evaluation systems and performance of integrated management of acute malnutrition projects in Narok County, Kenya. International Journal of Social Sciences Management and Entrepreneurship, 8(3), 1013-1023
Thomas, D. A., & Ely, R. J. (1996). Making differences matter. Harvard business review, 74(5), 79-90.
Wairiuko, J. W, Nyonje, R., & Omulo, E. O. O. (2020). Human resource capacity and adoption of e-government for improved service delivery in Kajiado County, Kenya. International Journal of Business and Social Science, 9(10), 94-110
Walter, S. L., Seibert, S. E., Goering, D., & O’Boyle Jr, E. H. (2022). A tale of two sample sources: Do results from online panel data and conventional data converge? In Key Topics in Consumer Behavior (pp. 75-102). Cham: Springer Nature Switzerland.
Zhu, Q., & Rass, S. (2018, October). Game theory meets network security: A tutorial. In Proceedings of the 2018 ACM SIGSAC Conference on Computer and Communications Security (pp. 2163-2165).