PROJECT QUALITY MANAGEMENT PRACTICES AND PERFORMANCE OF TANATHI WATER WORKS DEVELOPMENT AGENCY WATER PROJECTS, KENYA

Authors

  • Kori Emma Wanjiru Jomo Kenyatta University of Agriculture and Technology Author
  • Dr. Pedo Maurice Jomo Kenyatta University of Agriculture and Technology Author

Keywords:

Project Quality Management Practices, Quality Control, Quality Improvement, Performance, Tanathi Water Works Development Agency water projects

Abstract

Projects face many challenges and problems which include quality, time, and cost overrun in their completion worldwide. Water projects play a fundamental role in a nation's development and help meet one of society’s key needs.  The general objective of this study was to examine the relationship between project quality management practices and performance of Tanathi Water Works Development Agency water projects, Kenya. The specific objectives of this study were to examine the effect of quality control, and quality improvement on the performance of Tanathi Water Works Development Agency water projects, Kenya. The study was guided by change management theory, and goal setting theory. The study adopted a descriptive survey research design. The study focused on 23 water projects by Tanathi Water Works Development Agency, Kenya. The target population was 300 respondents. Yamane's (1967) formula was used to calculate 171 respondents comprising 13 project managers from Tanathi Water Works Development Agency and 158 project steering committee members from the four counties who were the unit of observation and who were sampled using stratified random sampling. Primary data was used in the study and it was collected using questionnaires. A pilot test was conducted with 10% of the sample, hence 18 project team members. The study used content and construct validity. Reliability was tested using the Cronbach Alpha coefficient. Statistical Package for Social Sciences (SPSS version 28) was used for analysis. Findings were tabulated. Findings show that; quality control has a positive strong significant correlation with performance of TAWWDA projects, and quality improvement has a positive strong significant correlation with performance of TAWWDA projects. The study recommends that; the quality control process should include a system for dealing with problems as they are.  If an error is detected, decisions on what to do should be made within the shortest time possible. The agency should create a flexible project plan in all aspects of the project to ensure that changes are accommodated to improve project outcomes.

Author Biographies

  • Kori Emma Wanjiru, Jomo Kenyatta University of Agriculture and Technology

    Degree of Masters in Project Management 

  • Dr. Pedo Maurice , Jomo Kenyatta University of Agriculture and Technology

    Lecturer

References

Abeysinghe, S. (2022). Project Quality Management. In Managing Information Technology Projects: Building a Body of Knowledge in IT Project Management (pp. 245-281).

Ader, H. J. (2008). Chapter 13: Missing data. In H. J. Ader & G. J. Mellenbergh (Eds.), with contributions by D. J. Hand, Advising on Research Methods: A Consultant’s Companion (pp. 305-332). Johannes van Kessel Publishing.

Boventura, W., & Kisimbii, J. (2019). Influence of total quality management principles on the success of construction projects performance in Mombasa County. (Unpublished master’s thesis). University of Nairobi.

del Solar Serrano, P., del Río Merino, M., & Villoria Sáez, P. (2020). Methodology for continuous improvement projects in housing constructions. Buildings, 10(11), 199.

Deshmukh, P., & Rajhans, N. R. (2018). Comparison of project scheduling techniques: PERT versus Monte Carlo simulation. Industrial Engineering Journal, 11, 1-13.

Farid, H. U., Ayub, H., & Khan, U. (2023). Groundwater quality risk assessment using hydro-chemical and geospatial analysis. Environmental Development and Sustainability, 25, 8343–8365.

Ghasemi, F., Sari, M., & Yousefi, V. (2018). Project portfolio risk identification and analysis, considering project risk interactions and using Bayesian networks. Sustainability, 10, 1609.

Giao, H. N. K., & Trang, N. D. (2021). Developing dimensions to measure the quality of construction project management service.

Iyer, Y. (2021). What is a PMIS and how does it work? Retrieved May 2022, from Wrike: https://www.wrike.com/what-is-a-pmis-and-how-does-it-work

Jasim, A. (2020). Diagnosing the causes of poor-quality management in Iraqi construction projects using the technique of root cause analysis. IOP Conference Series: Materials Science and Engineering, 1076, 012-116.

Jewell, C., & Flanagan, R. (2019). Code of quality management - Guide to best practice construction quality management. Chartered Institute of Building. Available from: https://www.ciob.org/industry/policy-research/resources/CIOB-code-quality-management.

Kinyua, E. (2015). Effect of risk management strategies on project performance of small and medium information communication technology enterprises in Nairobi, Kenya. International Journal of Economics, Commerce and Management, 3(2), 1-30.

Kothari, C. R., & Gang, W. (2014). Research methodology: Methods and techniques. New Age International Publishers Ltd.

Lawani, K., Munn, G., Hare, B., & Cameron, I. (2023). Evaluating the effectiveness of viewpoint on quality assurance. In E. Fidelis, F. Sherratt & A. Soeiro (Eds.), Proceedings of the CIBW099W123: Digital Transformation of Health and Safety in Construction (pp. 79-8). Universidade do Porto.

Lerche, J., & Neve, H. (2020). Quality improvements at operator level. Journal of Engineering, Project, and Production Management, 10(1), 64-70.

Maingi, J., & Marsh, S. (2020). Quantifying hydrologic impacts following dam construction. Journal of Arid Environment, 50, 53-79.

Mithika, L., & Moronge, M. (2017). Determinants of quality management in water and sanitation infrastructure projects in Nairobi City County, Kenya. The Strategic Journal of Business & Change Management, 4(5), 69-90.

Mogoa, A. M., & Muchelule, Y. (2023). Project schedule management on performance of construction projects in Mombasa County, Kenya. The Strategic Journal of Business & Change Management, 10(2), 582–603.

Muiruri, N., & Were, S. (2016). Drivers of effective project quality management in the construction industry in Nairobi County, Kenya: A case of EPCO Builders Limited. International Journal of Innovative Development & Policy Studies, 4(4), 1-19.

Murenga, Y. A., & Njuguna, R. (2020). Total quality management practices and service delivery of small and medium enterprises: Case of Horizons Offices Limited in Kenya. International Academic Journal of Human Resource and Business Administration, 3(8), 207–226.

Mwashuma, E., & Kisimbii, J. (2020). Determinants of performance of water projects in urban center in Kenya: A case of Mji Wa Kale Sub-Location in Mombasa County. Journal of Entrepreneurship and Project Management, 5(2), 23-45.

Nganga, G., & Nyaga, J. (2022). Continuous improvement practices and organizational performance of large manufacturing companies in Kenya: A case study of Nairobi Bottlers Limited. International Academic Journal of Innovation, Leadership and Entrepreneurship, 2(3), 411-169.

Nwafor, O. L. (2020). The relationship between total quality management and financial performance: A case study of Zenith and Fidelity Bank in Nigeria. [Unpublished master’s thesis]. Griffith College Dublin.

Obegi, D. O., & Kimutai, G. J. (2017). Resource scheduling and project performance of international not-for-profit organizations in Nairobi City County, Kenya. International Academic Journal of Information Sciences and Project Management, 2(2), 199-217.

Ronoh, K., & Kirui, C. (2020). Influence of resource scheduling on the performance of residential construction projects in Nairobi City County, Kenya. International Journal of Research and Innovation in Social Science, 6(12), 409-414.

Roseke, B. (2019). Eight functions of PMIS. Retrieved April 2022, from Project Engineer: http://projectenginer.net/8-functions-of-project-management-information-system.

Saunders, M., Lewis, P., & Thornhill, A. (2014). Research methods for business students. Pearson Limited.

Schönbeck, P., Löfsjögård, M., & Ansell, A. (2021). Exploring the applicability of configuration information in construction projects. Intelligent Buildings International, 13(2), 91-102.

Seyoum, M. (2018). Quality challenges of low-cost housing: The case of Addis Ababa 20/80 condominium housing. (Unpublished master’s thesis). Saint Mary’s University.

Sinesilassie, E. G., Tabish, S., & Jha, K. (2018). Critical factors affecting cost performance: A case of Ethiopian public construction projects. International Journal of Construction Management, 18(2), 108-119.

Singh, D. (2014). Managing cross-cultural diversity: Issues and challenges in global organizations. Journal of Mechanical and Civil Engineering.

Taniguchi, A., & Onosato, M. (2018). Effect of continuous improvement on the reporting quality of project management information system for project management success. International Journal of Information Technology and Computer Science, 1, 1-15.

Tchamba, J. C., & Bikoko, T. G. (2015). Failure and collapse of building structures in the cities of Yaounde and Douala, Cameroon from 2010 to 2014. Modern Applied Science, 10(1), 23-33.

Waduu, D. W., & Rugami, M. (2019). Total quality management practices and performance of commercial banks in Kilifi Town, Kenya. International Journal of Current Aspects, 3(6), 1-15.

Waswa, M. (2018). Impact of devolved construction management process on quality of public building projects in Kenya: A case of Busia County, Kenya. (Unpublished master’s thesis). University of Eldoret.

Waziri, B. S. (2016). Design and construction defects influencing residential building maintenance in Nigeria. Jordan Journal of Civil Engineering, 10(3), 313-323.

Viraj, N., Dhimmar, D., & Sharma, A. (2016). Evaluation of factors influencing change management for construction project by SPSS tool. International Journal of Scientific Development and Research, 1(5), 361-364.

Yan, P., & Liu, J. (2021). Risk response incorporating risk preferences in international construction projects. Engineering, Construction and Architectural Management, 4(1).

Downloads

Published

2024-09-25

How to Cite

PROJECT QUALITY MANAGEMENT PRACTICES AND PERFORMANCE OF TANATHI WATER WORKS DEVELOPMENT AGENCY WATER PROJECTS, KENYA. (2024). International Journal of Management and Business Research, 6(2), 122-136. https://grandmarkpublishers.com/index.php/IJMBR/article/view/37