POST-AWARD CONTRACT RELATIONSHIP MANAGEMENT AND PERFORMANCE OF NATIONAL GOVERNMENT ROAD PROJECTS IN KENYA; MODERATING ROLE OF REGULATORY FRAMEWORK ADOPTION

Authors

  • Lagat Robert Kipngetich Jomo Kenyatta University of Agriculture and Technology Author
  • Dr. Noor Shalle Jomo Kenyatta University of Agriculture and Technology Author
  • Dr. Omwenga Jane Jomo Kenyatta University of Agriculture and Technology Author
  • Dr. Namusonge Eric Jomo Kenyatta University of Agriculture and Technology Author

Keywords:

Regulatory framework, Post-contract relationship management, Performance, National government road construction projects

Abstract

Road construction projects in Kenya have been getting sustainability warning owing to poor quality standards. With a dearth of studies on the effects of post contract, this study sought to fill the gap by, establishing the impact of post-contract relationship management on performance of national government road construction projects in Kenya and to establish the moderating impact of regulatory framework on the relationship between post-contract relationship management and performance of national government road construction projects in Kenya. The study was guided by stakeholder theory. The target population for the research was all 255 on-going road projects by road agencies in Kenya which are Kenya National Highway Authority (KeNHA), Kenya Rural Roads Authority (KeRRA) and Kenya Urban Roads (KURA). Therefore, the target population was 255 road projects. The overall sample size for this study was determined using the Nassiuma (2000) formula. The sample size for the study was 127 projects. This study used stratified random sampling technique to select the sample. Primary data was obtained utilizing a semi-structured questionnaire. The Statistical Package for Social Sciences (SPSS) version 25 software was used to analyse the data. Qualitative data was analysed using content analysis and presented in prose form. Qualitative data was analysed using descriptive and inferential analysis. Pearson correlation coefficient was used for testing strength and direction between the independent and the dependent variables. A multiple regression model was used to test the significance of the influence of the independent variables on the dependent variable. The findings were presented in Tables and figures. The study found that a unit increase in post-contract relationship management resulted in a 0.782-unit (P < 0.05) improvement in project performance. Further regulatory framework moderates the relationship between post-contract relationship management and performance, signifying that an improvement in regulatory frameworks positively influences the impact of contract management on performance. National government agencies overseeing road projects should recognize the importance of strong and collaborative relationships with contractors and suppliers. To improve project performance, these agencies should foster an environment of trust and cooperation through effective communication and conflict resolution mechanisms. Encouraging open dialogue and the sharing of ideas can lead to innovative solutions and better project outcomes. Additionally, agencies should consider establishing long-term partnerships with contractors who consistently demonstrate a commitment to quality and timely project delivery.

Author Biographies

  • Lagat Robert Kipngetich, Jomo Kenyatta University of Agriculture and Technology

    Phd Scholar, Supply Chain Management

  • Dr. Noor Shalle, Jomo Kenyatta University of Agriculture and Technology

    Senior Lecturer

  • Dr. Omwenga Jane, Jomo Kenyatta University of Agriculture and Technology

    Senior Lecturer in Entrepreneurship

  • Dr. Namusonge Eric, Jomo Kenyatta University of Agriculture and Technology

    Lecturer

References

Amin, A.K. (2018). Electronic procurement and organizational performance among commercial state corporations. University of Niarobi.Pp.1-48

Chuah, P. K., (2012, September). Management and Utilization of Road Equipment. Circular Issued by Permanent Secretary, Ministry of Education & Sports dated 20th September 2012

Cleland, D.I. & Ireland, L.R. (2017). Project Management: Strategic Design and Implementation. McGraw-Hill Company, New York.

Fapohunda & Stephenson (2019). Analysis of pre‐qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27(12), 1245-1263.,

Ingle, P & Mahesh, G. (2016). Project Performance Appraisal using PQR: A Review.

Kolani, J. S., & Miroga, J. B. (2019). Influence of contract management practices on supply chain performance of state corporations in the ministry of energy. The Strategic Journal of Business & Change Management, 6 (4), 571 – 587

Lazar, F. (2020). Project Partnering: Improving the Likelihood of Win/Win Outcomes. Journal of Management in Engineering, 16(2), 71-83.

Lee, M. (2019). IT outsourcing contracts: practical issues for management. Industrial Management & Data Systems. Vol. 96, pp 15-20

Lepartobiko, T. (2018). Development of performance-based service strategies for the oil and gas industry, a case study. Journal of Business & Industrial Marketing, 22(4), 272-280

Mohd A, Khairul & Ismail, Syuhaida & Saleh, Abd Latif. (2018). Contractor’s Performance Appraisal System in the Malaysian Construction Industry: Current Practice, Perception and Understanding. International Journal of Engineering & Technology. 7. 46. 10.14419/ijet.v7i3.9.15272.

Mutangili, S. K. (2019). Effects of Procurement Law on Procurement Performance: A Case of Kenya National Highway Authority. Journal of Procurement & Supply Chain, 3(1).

Nyika, D. (2018). An Analysis of the Causes of Failures in the Implementation of ProjectsinKenya.AvailablefromURIhttp://erepository.uonbi.ac.ke:8080/xmlui/han dle/123456789/15012.

Packendorff, J. (2017). “Inquiring into the Temporary Organization: New Directions for Project Management Research”, Scandinavian Journal of Management, 11, 319-333.

Packendorff, N. (2017).”Partnering in Construction; A critical Review of Issues, Problems and Dilemmas. “Construction Management and Economics, 18,229-237

Pryke, A. (2017). Getting results: the six disciplines for performance-based project management. New York, NY: Riverwoods.

Pryke, S. (2016). Projects as Networks of Relationships. In S. Pryke , and S. Smyth (Eds.), The Management of Complex Projects: A relationship Approach, 213-235. Oxford: Blackwell

Ramachandra, T. (2017). Exploring Feasible Solutions to Payment Problems in the Construction Industry in New Zealand. Auckland University of Technology. Auckland: AUT.

Sarfo, P.A, & Baah-Mintah, R. (2017). Assessing the Effect of the Procurement Act (663) on the Public Financial Management in Ashanti Region. American Journal of Rural Development 1(4), 91-98.

Thai, K. (2018). Introduction to Public Procurement. National Institute of Government Purchasing, Florida, Atlanta University. 1st Ed

Downloads

Published

2024-09-20

How to Cite

POST-AWARD CONTRACT RELATIONSHIP MANAGEMENT AND PERFORMANCE OF NATIONAL GOVERNMENT ROAD PROJECTS IN KENYA; MODERATING ROLE OF REGULATORY FRAMEWORK ADOPTION. (2024). International Journal of Management and Business Research, 6(1), 079-093. https://grandmarkpublishers.com/index.php/IJMBR/article/view/21