PROJECT MANAGEMENT AND PERFORMANCE OF HEALTH SECTOR PROJECTS IN METROPOLITAN COUNTIES IN KENYA

Main Article Content

Alex Mutinda Kioko
Dr. Mose Thomas, Phd

Abstract

Despite the importance of health sector projects, many metropolitan counties in Kenya face significant challenges in project performance. These challenges manifest in delays, cost overruns, and failure to meet the desired quality and outcomes. The general objective of the study is to analyze the effect of project management on performance of health sector projects in metropolitan counties in Kenya. Specifically, the study sought to investigate the effect of Stakeholder Involvement on performance of health sector projects in metropolitan counties in Kenya, and to examine the effect of monitoring and evaluation on performance of health sector projects in metropolitan counties in Kenya. This study was anchored on Stakeholders theory and Resource Based View Theory. The study adopted a cross-sectional research design. This study was conducted in Metropolitan counties in Kenya which include; Kajiado county, Machakos county, Nairobi county and Kiambu County. The study focused on 44 projects implemented by Level 6 hospitals in the 4 counties. The study targeted the management level employees at the level 6 hospitals. Management employees targeted because it is believed that they are involved in project management in the hospitals. From the ministry of health website, the hospitals has approximately 1500 employees. Therefore, the study population was 1500 employees. The Yamane formula was adopted to calculate the study sample size. The study used simple random sampling in selecting the sample of 316 respondents from study population. Data was collected using a self-administered semi-structured questionnaire. The Statistical Package for Social Sciences (SPSS) version 25 software was used to analyze the data. Qualitative data was analysed using content analysis and presented in prose form. Qualitative data was analysed using descriptive and inferential analysis. Descriptive statistics such as frequency, percentages, and means were used. Pearson correlation coefficient was used for testing strength and direction between the independent and the dependent variables. A multiple regression model was used to test the significance of the influence of the independent variables on the dependent variable. The findings were presented in Tables and figures. The study concludes that stakeholder involvement has a positive and significant effect on performance of health sector projects in metropolitan counties in Kenya. The study also concludes that monitoring and evaluation has a positive and significant effect on performance of health sector projects in metropolitan counties in Kenya. Based on the findings, the study recommends that the management of public hospitals should establish comprehensive stakeholder engagement frameworks that prioritize inclusive participation and continuous feedback. 

Article Details

How to Cite
PROJECT MANAGEMENT AND PERFORMANCE OF HEALTH SECTOR PROJECTS IN METROPOLITAN COUNTIES IN KENYA. (2024). Journal of Applied Social Sciences in Business and Management, 3(2), 254-267. https://grandmarkpublishers.com/index.php/JASSBM/article/view/45
Section
Articles
Author Biographies

Alex Mutinda Kioko , Jomo Kenyatta University of Agriculture and Technology

Masters of Science in Project Management 

Dr. Mose Thomas, Phd, Jomo Kenyatta University of Agriculture and Technology

Lecturer

How to Cite

PROJECT MANAGEMENT AND PERFORMANCE OF HEALTH SECTOR PROJECTS IN METROPOLITAN COUNTIES IN KENYA. (2024). Journal of Applied Social Sciences in Business and Management, 3(2), 254-267. https://grandmarkpublishers.com/index.php/JASSBM/article/view/45

References

Abdulrahman, A. (2019). “Critical success factors and implementation of capital expenditure projects of Telkom Kenya limited within Nairobi City County, Kenya “

Abuya, M. 2019). “: Influence of Effective Management Practices on Project Performance in Sotik Sub- County, Bomet County, Kenya (Doctoral dissertation, University of Nairobi). Academic Journal of Information Sciences and Project Management,3(2), 80-110.”

Adek, R.T. (2020).” Determinants of successful projects implementation of infrastructure project in devolved units; A case Study of Mombasa County, Kenya.”

Bredillet, C., Tywoniak, S., & Dwivedula, R. 2019).” What is a good project manager? An Aristotelian perspective. International Journal of Project Management, 33(2), 254-266.”

Bwogen, R & Muthoni, M. E. (2023). Effect of stakeholder involvement on performance of Bomet County Government, Kenya. Journal of Entrepreneurship & Project Management, 7(2), 26-41.

Carbone, T. & Gholston. S. (2020). “Project Manager Skill Development: A Survey of Programs and Practitioners. Engineering Management Journal, 16(3), 10-16. ”

Chan W., & Mohan M., (2009). “Compressing construction durations: lessons learned from Hong Kong building projects, International Journal of Project Management, 20, 23.35”

Cheluget, D. C. (2020). “Effect of financial management practices and project performance in Uasin Gishu county, Kenya. International Journal of Economics, Commerce and Management United Kingdom Vol. V, Issue 5, May 2020 Page 214.”

Fraz, A, Waris, A, Afzal, S, Jamil, M, Shah, S. T. H & Sultana, S. (2020). Effect of project management practices on project success in make-to-order manufacturing organizations. Indian Journal of Science and Technology, 9(21), 1-8.

Grant, R. (2017). Contemporary Strategy Analysis, (4 Ed). Blackwell Publishers

Jamaal, N. (2018). “Effects of participatory monitoring and evaluation on project performance at Kenya Marine and Fisheries Research Institute, Mombasa,”

Kahungura, R.K. (2020). “Influence of project management practices on performance of mobile money transfer in Kenya: A case of orange money.”

Kaniaru. S. (2020). “factors affecting the performance of construction projects in Mombasa County, Kenya. Kenya. International Academic Journal of Information Sciences and Project Management, 3(1), 1-15”

Kimanzi, A & Ngugi, L. (2022). Stakeholder involvement and implementation of projects by Kitui County Government, Kenya. Journal of Entrepreneurship and Project Management, 2(5), 1-9.

Kimweli, J. M. (2018). “The role of monitoring and evaluation practices to the success of donor journal o funded food security intervention projects A case study of Kibwezi District. International f academic research in business and social sciences, 3(6), 9.”

Kisamo, L & Mokaya, S. O. (2020). Project management practices and performance of construction projects in Tanzania; a case of selected construction firms in Mwanza. International Journal of Social Science and Humanities Research, 7(2), 363-370.

Kobusingye, B., Mungatu, J. K., & Mulyungi, P. (2020). “Influence of stakeholders’ involvement on project outcomes. A case of water, sanitation, and hygiene (wash) project in Rwanda. European Journal of Business and Social Sciences, 6(6), 195-206.

Kothari, C. R. (2019). Research methodology: Methods and techniques. New Age International

Lawal, Y & Basheer, S. M. (2022). Role of monitoring and evaluation of project performance in the federal capital territory AbujaNigeria, 2017-2021. Journal of Business and Management, 24(12), 50-56.

Miombe, M. M, Kaswira, J & Lango, B. (2024). Stakeholder involvement practices and implementation of county government funded water projects in Kisii County Kenya. International of Economics, Commerce and Management, 12(2), 245-255.

Mongina, C & Moronge, M. (2021). Project management practices and performance of road construction projects in Nairobi City County, Kenya. The Strategic Journal of Business & Change Management, 8(1), 545–562.

Mugenda A. &Mugenda O. (2017).Research Methods: Quantitative & Qualitative approaches. African Centre for Technology Studies (ACTS), Nairobi, Kenya.

Nnadi, E. O. E & Oyama, E. O. (2023). Evaluating the influence of stakeholders’ involvement on the performance of road construction project in Nigeria. European Journal of Historical Research, 5(2), 1-15.

Nyanje, V. S & Kisimbii, J. (2020). Influence of monitoring and evaluation on the performance of county government funded projects; a case of Kwale County. Journal of Entrepreneurship & Project Management, 4(1), 42-58.

Umumararungu, A. F & Mulyungi, P. (2020). Influence of stakeholder involvement on successful implementation of housing projects in Rwanda: a case study of the gate real Estates project. International Journal of Management and Commerce Innovations, 6(1), 576-590.

Uwera, C & Wanjiku, C. (2023). Monitoring and evaluation practices and performance of non-government organizations in Rwanda: a case study of income-generating activities project by health relief and development organization. Journal of Entrepreneurship & Project Management, 7(4), 30-47.

Wairimu, F. K & Nyang’au, S. P. (2022). Effect of project management practices on performance of construction projects in Laikipia County, Kenya. International Journal of Recent Research in Social Sciences and Humanities, 5(2), 7-13.

Waweru, S. W & Kimathi, D. (2022). Project monitoring and evaluation practices on performance of national government water and sanitation projects in Machakos County, Kenya. Social Sciences & Humanities Open, 3(2022), 95-105.

Similar Articles

You may also start an advanced similarity search for this article.