PROJECT QUALITY MANAGEMENT PRACTICES AND PERFORMANCE OF AFFORDABLE HOUSING PROJECTS IN NAIROBI CITY COUNTY, KENYA

Authors

  • Gathu Samuel Ndirangu Jomo Kenyatta University of Agriculture and Technology Author
  • Dr. Nyang’au Samson Paul Jomo Kenyatta University of Agriculture and Technology Author

Keywords:

Project Quality Management Practices, Quality Control, Quality Planning, Performance, Affordable Housing Projects

Abstract

Project quality management practices play a pivotal role in the successful execution and completion of construction projects. Despite the efforts to implement project quality management practices in building construction projects in Kenya, there remains a notable disparity between planned quality and actual outcomes.  The general objective of the study was to determine the effect between project quality management practices and the performance of affordable housing projects in Nairobi City County, Kenya. The specific objectives were to examine effect of quality planning and control and improvement on the performance of affordable housing projects in Nairobi City County.  The study was guided by Juran trilogy theory and Crosby theory of quality management. The study used a descriptive survey. The unit of analysis was six affordable housing projects in Nairobi City County. The unit of observation was 6 project managers, 60 contractor representatives, and 54 project consultants.  The study used a census hence the sample included 120 respondents.  Questionnaires was used to collect data.  A pilot was conducted with 10% of the sample hence 12 respondents took part in the pilot. The study used content and construct validity.  Reliability was tested using Cronbach’s Alpha Coefficient.  The study used SPSS version 28. Findings were presented in tables. The content of the questionnaire was approved by supervisor and project management professionals in the affordable housing sector. Construct validity results show that all variables had AVE above 0.5. Reliability shows that all variables scored Cronbach alpha values of above 0,7 an indication that they were all reliable. Among the variables, quality control had the strongest impact (β = 0.354, p = 0.001), followed by quality planning (β = 0.301, p = 0.002). These findings confirm that projects prioritizing structured planning, strict quality control, strategies achieve better performance in terms of budget adherence, timely completion, and compliance with quality standards. The study concludes that strengthening material supply chains, enhancing risk management in quality assurance, improving defect resolution in quality control, and technology adoption and promoting knowledge-sharing in quality improvement will significantly enhance the performance of affordable housing projects. It recommends the adoption of digital monitoring tools, stricter enforcement of compliance measures, and continuous learning programs to optimize project execution. Since 23.6% of project performance remains unexplained, further research should explore the influence of financial management practices, policy frameworks, and emerging technologies on affordable housing project success.

Key Words: Project Quality Management Practices, Quality Control, Quality Planning, Performance, Affordable Housing Projects

Author Biographies

  • Gathu Samuel Ndirangu, Jomo Kenyatta University of Agriculture and Technology

    Masters in Project Management in the Jomo Kenyatta University of Agriculture and Technology

  • Dr. Nyang’au Samson Paul, Jomo Kenyatta University of Agriculture and Technology

    Lecturer at Jomo Kenyatta University of Agriculture and Technology, Kenya

References

Abdul-Rahman, H., & Wang, C. (2024). Significance of quality management in construction projects: A literature review. Journal of Construction Engineering and Management, 143(11), 04017089.

Aziz, R. F., & Abdel-Hakam, A. A. (2024). Exploring delay causes in road construction projects in Egypt. Alexandria Engineering Journal, 55(2), 1515–1539.

Baleni, E., & Gande, T. (2023). Effect of project planning and scheduling on project success in Botswana. International Journal of Project Management and Development, 4(2), 22–34.

Boventura, W. & Kisimbii, J. (2021). Influence of Total Quality Management Principles on the Success of Construction Projects Performance in Mombasa County. Unpublished Masters’ Thesis, University of Nairobi.

Chan, A. P. C., & Tam, C. M. (2020). Factors affecting the quality of building projects in Hong Kong. International Journal of Quality & Reliability Management, 17(4), 423–441.

Deloitte. (2022). Infrastructure and Capital Projects in Kenya: Project Delivery Report. Nairobi: Deloitte Kenya.

Ganaway, N. B. (2021). Construction Business Management: A Guide to Contracting for Business Success. Butterworth-Heinemann.

Hagan, K. (2020). Effects Of Quality Control Measures On Construction Project Schedules. Kwame Nkrumah University of Science and Technology.

Ifran, M., & Khan, Z. (2021). Role of Project Planning and Project Manager Competencies on Public Sector Project Success. Sustainability, 13(3), 1421.

Jogdand, P., & Deshmukh, S. S. (2024). Development of building quality measurement tool: Building construction quality index (BCQI). International Research Journal of Engineering and Technology (IRJET), 4(1), 1020–1026.

Juran, J. M. (1986). The Quality Trilogy: Quality Planning, Quality Control, and Quality Improvement. McGraw-Hill.

Kinyumu, D. N., & Mungai, D. M. (2022). Effect of project quality on performance of Bank financed housing programs in Nairobi Metropolitan Area. International Journal of Project Management Research, 6(1), 17–30.

Kipkoech, A., & Gachengo, L. (2021). Stakeholder participation and performance of government affordable housing scheme: Case study of Park Road Ngara Housing in Nairobi City County, Kenya. The Strategic Journal of Business & Change Management, 8(4), 676–687.

KNBS (Kenya National Bureau of Statistics). (2021). Kenya Population and Housing Census: Analytical Report on Urbanization. Nairobi: KNBS.

Loosemore, M. (2024). Importance of quality management systems in construction: A review of the literature. Construction Management and Economics, 34(1), 1–17.

Love, P. E. D., Smith, J., Ackermann, F., Irani, Z., & Teo, P. (2022). The costs of rework: Insights from construction and opportunities for learning. Production Planning & Control, 29(13), 1082–1095.

Muhammad, M., & Harkamal, S. (2023). Analysis of the Impacts of Quality Assurance and Quality Control on Construction Projects using RII method. E3S Web of Conferences, 399, 03021.

NCA (National Construction Authority). (2023). Annual Report on Construction Projects Supervision and Quality Assurance. Nairobi: Government of Kenya.

Nderitu, S., & Nyaegah, J. (2022). Project Quality Management and Performance of County Government Projects in Kenya. African Journal of Project Management, 10(2), 34–45.

Nesto, F. O. (2021). Effects of quality management practices on organizational project performance in Kenya. University of Nebraska Medical Center.

Osuman, I., & Muchelule, D. (2024). Monitoring Tools and Performance of Affordable Housing Projects in Nairobi City County, Kenya. International Journal of Social Sciences Management and Entrepreneurship, 8(2), 710–722.

Priyadharsan, S., & Raja, M. (2020). Impact of Quality Control and Management in Constructions. International Research Journal of Engineering and Technology, 7(5), 3968–3974.

Ronoh, K., & Kirui, C. (2020). Influence of Resource Scheduling on the Performance of Residential Construction Projects in Nairobi City County, Kenya. International Journal of Research and Innovation in Social Science, 6(12), 409–414.

State Department for Housing. (2023). Status Report on Affordable Housing Projects in Kenya. Nairobi: Ministry of Lands and Urban Development.

Transparency International. (2022). Kenya: Corruption and Governance in the Construction Sector. Nairobi: Transparency International Kenya.

Unegbu, R., Muganda, P., & Nyaberi, J. (2022). Challenges Affecting the Quality of Housing Construction in Nairobi. East African Journal of Engineering, 5(3), 122–135.

Downloads

Published

2025-04-15

Issue

Section

Articles

How to Cite

PROJECT QUALITY MANAGEMENT PRACTICES AND PERFORMANCE OF AFFORDABLE HOUSING PROJECTS IN NAIROBI CITY COUNTY, KENYA. (2025). Journal of Applied Social Sciences in Business and Management, 4(1), 152-166. https://grandmarkpublishers.com/index.php/JASSBM/article/view/81

Similar Articles

1-10 of 29

You may also start an advanced similarity search for this article.